R Mackey: I was wrong about the NIST report mentioning the debris damage.
I was refering to the summary on pg 50 but i was wrong . They refered to the debris damage there too.
I apologise and i stand corrected.
However in re-reading the report i noticed a cunndrum.
On pg 8: Note the location of the lobby is in the area supposidly destroyed by debris.
On pg 18: "Damage to the south face was described by a number or individuals. While the accounts are mostly consistent, there are some conflicting descriptions:
-middle 1/4 to 1/3 width of the south face was gouged out from floor 10 to the ground
-
-
-
At 12:10 to 12:15 p.m.:
* Firefighters found individuals on floors 7 & 8 and led them out of the building
*
*
* No heavy debris was observed in the lobby area as the building was exited, primairly white dust coating and black wires hanging from celing areas were observed
|